An office IT move in Dubai succeeds or fails on lead times, not on moving day. The internet line at the new address is ordered first because it takes the longest, cabling goes in before the fit-out closes, and equipment moves over a weekend so everything is tested before staff arrive on Monday.
Proof, not promises
Real reviews from Trustpilot and Google, word for word. Google rating 5.0 from 5 reviews, checked 2026-10-17.
Best team I’ve ever hired. All in one place.
As a construction company, we have a lot to manage, so finding one team that can handle our IT and digital requirements has been really helpful. Listonics has supported us with office networking, cybersecurity, website development and SEO. Their team knows what they’re doing and has been easy to work with. We no longer need to coordinate with different companies for every requirement, which saves us time and effort. Overall, it’s been a good experience, and we’re happy to have them supporting our business.
We needed a custom ERP and HR system…
We needed a custom ERP and HR system for our business, along with a new website, and Listonics helped us with all three. The team was approachable, listened to what we wanted and made the process easier than we expected. We could discuss changes directly with them, which made a big difference. It was also convenient having one team handle everything instead of dealing with multiple companies. Overall, we’re happy with how things turned out and glad we chose them.
Listonics projects run from AED 2,500 to AED 30,000 as a fixed scope; support is a fixed monthly fee with response times written into the agreement. The IT support cost guide and managed IT pricing guide set out how the numbers are built.
What does an IT relocation actually involve?
Most of the work happens weeks before anything is carried out of the old office. The physical move is one weekend; the planning that makes it survivable is six to eight. This page sets out how an office IT move runs; our office IT relocation service is how Listonics delivers it.
The sequence matters more than any single task. The internet line at the new address is ordered as soon as documents allow, because provisioning is the longest lead time and nothing else can be finished without it. Both du and e& publish what they need to start an order and whether a transfer or a new installation applies.
- Survey the new space and design the network before the fit-out closes ceilings.
- Order the internet line early; arrange overlap with the old line if downtime is unacceptable.
- Cabling, comms room and power ready and tested before equipment arrives.
- Equipment moved and rebuilt over a weekend, not during business hours.
- Full test of every desk, printer, meeting room and phone before staff return.
How do you move without losing a working day?
The realistic aim is not zero downtime but zero lost working time, which is a different and much more achievable target. Anything cloud-based keeps working throughout, so a Microsoft 365 office can operate from home or a serviced space for a day if needed.
Overlap is what buys the margin. Keeping the old line live for a week after the move costs a fraction of a lost Monday, and lets you fall back if the new line slips. Moving over a Friday night and Saturday gives a full day to find problems before anyone depends on the result.
What usually goes wrong in a Dubai office move?
The failures repeat, and almost all of them are scheduling rather than technical.
The internet line is ordered too late and arrives after move-in. The new landlord requires approvals nobody asked about until the contractor was on site. Data points were installed to a floor plan that changed when the furniture was ordered. The comms room has no dedicated power circuit or cooling. And the public IP address changes, which quietly breaks a VPN, a phone system or whatever portal recognises the office by its address.
- Line ordered late, or a transfer assumed where a new installation was needed.
- Building approvals for cabling works discovered on the day.
- Outlet positions from a superseded furniture plan.
- Comms room without dedicated power or cooling.
- A changed public IP breaking VPN, phones or a supplier portal.
What happens to servers, NAS units and the comms room?
Physical equipment is the part with the least tolerance for improvisation. Anything holding data is backed up and the backup verified before it is unplugged, not after, and the rack is photographed and labelled so it can be rebuilt exactly rather than from memory.
If your move is mainly about physical equipment rather than a whole office, our server and comms room relocation page covers that work specifically, including the downtime window and the rebuild.
Who else has to be coordinated?
An office move has more parties than an office fit-out, and IT sits downstream of most of them. The furniture supplier decides where desks go, which decides where outlets are needed. The fit-out contractor runs the cable. The building at the new address controls riser access and approvals, and the building at the old address controls when equipment can leave and through which lift.
The internet provider works to its own schedule and will not chase your contractor. Landlords at both ends have their own notice requirements, and dilapidation terms at the old office sometimes include making good where cabling was installed. None of these are technology problems, and all of them can stop a technology project.
- Furniture layout before outlet positions; outlet positions before cabling.
- Building approvals at both addresses, including lift booking for the move.
- Internet provider chased weekly, because nobody else will.
- Dilapidation terms at the old office, which may cover removing cabling.
- A single point of contact who holds all of it, which is the job we do.
How is critical data protected during an IT move?
Computers can be replaced. Your critical data cannot. So before a single cable is unplugged, the data your business depends on gets backed up, and that backup gets tested. Then if a NAS gets dropped or a server gets damaged on the way, it is a headache, not a disaster.
Servers and storage are moved by people who know what is on them. They are shut down in the right order and checked when they are switched on at the new office. Anything that exists on only one device is copied somewhere safe first. Equipment also travels in a closed, cool vehicle. A server left in the back of a pickup in August is asking for trouble.
What relocation requirements should be agreed before the move?
Most moving problems come from decisions made too late. Sort out these relocation requirements early and your move date stays realistic:
- The internet line for the new office ordered from du or e&, with the install date confirmed. New lines can take a few weeks, so this is the first thing we book.
- Cabling and the comms room ready before any equipment arrives.
- A list of every device that is moving, and anything being retired or replaced.
- Who can sign off each stage, from your side and the landlord's, plus the building management approvals for after-hours work and goods lift bookings.
- Relocation support on your first working day in the new office.
What does Listonics do during a relocation?
We act as the single accountable party for the technology side. That means surveying the new space, designing the network, ordering and chasing the line, briefing the fit-out contractor and inspecting their cabling before the ceilings close, then moving, rebuilding and testing the equipment over an agreed window.
You receive the documentation at handover: network diagram, asset register, account list and port map, plus the provider account references. Our office IT relocation service page covers the scope, and the relocation checklist sets out the full timeline week by week.
- A written plan with owners and dates, not a moving-day checklist.
- Engineers on site across the UAE for the move window.
- Fixed-scope quote after a survey of both addresses.
- Documentation handed over, and yours to keep.
How early should you start?
Eight weeks before the move is comfortable; six is workable; four means accepting that something will be improvised. The constraint is almost never our availability, it is the internet provider and the building.
If you have signed a lease and have a date, that is the moment to start, even if the fit-out has not been designed. The two decisions that need making earliest, the comms room location and the outlet plan, are the two that are most expensive to change later. Book a free relocation assessment and we will work from your floor plan.
Frequently asked questions
Plan six to eight weeks from survey to move for a typical office, most of it waiting on the internet line and the fit-out rather than on IT work. The move itself is usually one weekend. Four weeks is possible but leaves no margin if the provider or the building slips.
Not if the lines overlap. Keeping the old connection live for a week after the move costs little and removes the risk entirely. Where an overlap is not possible, a temporary 5G router can carry a small team while the fixed line is completed.
Numbers usually move with a cloud phone system and often with a fixed line, depending on the provider and the new address. A public IP address normally changes, which can break VPNs, phone systems and portals that recognise your office. Both need confirming with the provider before the move, not after.
Move what has life left and replace what is close to end of support, which the survey identifies. A move is a convenient moment to retire ageing switches or a firewall past vendor support, because the labour is already being spent. It is a poor moment to replace everything at once.
Yes, and we recommend it. A Friday night and Saturday move gives a full day to find and fix problems before staff return, which a weekday move does not. The window is agreed in writing in advance along with what happens if something is not ready.
Written by Srinivasan Ramachandran, Founder, Listonics · Last reviewed October 29, 2026